ArchitectureDeploy pipeline
Switch and go live
After the health checks pass, the engine changes the routes, marks the deploy live and stops the old instances.
All the new instances passed the health check. After this point, the deploy cannot go back.
1 / 5
After the health check passes, the deploy cannot go back. A cancel after the switch gets a refusal.
The order matters
The engine marks the deploy live before it stops the old instances. If the server stops during the drain, it comes back with the new deploy.
The change of routes and the wait of 2 seconds apply to web services and static sites. Other services have no route.
The end of the log
==> Your service is live 🎉The URLs of the service come after this line.